Request for proposals from consultants RFP
The process of selecting consultants might involve the preparation by the client of a 'request for proposals' (RFP) which is sent out to each prospective consultant. Consultants respond by submitting 'consultant's proposals' to the client.
The request for proposals describes the nature of the project, the nature of the appointment and a description of the information required from the consultant.
The request for proposals might include:
- The strategic brief.
- The management structure.
- The scope of consultant services required and how fees should be quoted and broken down against stages of the project.
- The project programme.
- The construction budget (without contingencies and VAT).
- The intended method of procurement (or a request for options if the procurement route has not been chosen yet).
- The form of agreement and conditions of engagement (such as step-in rights, warranties, a model enabling amendment making a BIM protocol part of the contract documents, and so on).
- The level of professional indemnity insurance required.
- The selection criteria that will be used.
- The procedure that will be followed.
- If building information modelling (BIM) is being used, the Employer's Information Requirements (EIR).
- Targets for post-occupancy evaluation.
It might request consultant's proposals including:
- A list of key personnel to be allocated to the project, their role in the project, CVs of staff and a description of relevant experience on similar projects.
- Hourly rates to be applied to any work outside the proposed scope of services.
- Identification of any sub-consultants the candidate intends to use.
- A broken-down payment and resource schedule with trigger dates against work stages.
- Evidence of professional indemnity insurance.
- If BIM is being used, a BIM execution plan.
- A list of recently completed commissions with referees and detailed of other consultants involved.
- A statement of design intent based on the brief.
If the request for proposals involves significant design work from the consultant, it is good practice for the client to offer payment for the work involved in preparing these designs. This will encourage the consultant to prepare their proposal more carefully, and will also demonstrate to them that the client is serious about the project and is likely to treat them fairly.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Architect's fees.
- Automated vendor selection.
- Budget.
- Building information modelling.
- Collaborative practices.
- Consultant team.
- Consultant team start up meeting.
- Consultant's proposals.
- Design liability.
- Employer's information requirements.
- Employer's requirements.
- Fees.
- Fee proposals.
- Management structure.
- Procurement route.
- Professional indemnity insurance.
- Project programme.
- Proposals.
- RFx.
- Schedule of services.
- Strategic brief
Featured articles and news
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
50 million new trees over 25 years.
Art of Building CIOB photographic competition public vote
The last week to vote for a winner until 10 January 2025.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.